Admin – Add Project (Project Management Module)
Last Updated: 26 November 2026
What you can see and do here depends on the permission group (role) your admin has given you. If you can't see Project Management in the Admin area, ask your Super Admin.
What This Feature Is
Plumm Project Management is where you build the list of work that people record time against in My Timesheet. It has three levels, and you always set them up in this order:
- Clients. A client is a company you do work for, such as "Harbour Design Ltd". You can also add your own company as a client for internal work.
- Projects. A project is one job for a client, such as "Office Refit". Every project belongs to one client. A project has dates, a manager, the people who can work on it, a Billable switch and an optional estimate in cost or hours.
- Tasks. A task is one smaller piece of work inside a project, such as "Site Survey" or "Client Meeting". Every task belongs to one project. People pick tasks in My Timesheet and type their hours against them.
You manage all three in Admin > Project Management, on the Client, Project and Task tabs. Projects you no longer use move to the Archived tab.
Example 1. Priya runs a small design agency. She adds the client "Harbour Design Ltd", then a project "Office Refit" for that client, with a start and end date, herself as Manager, Billable on and an estimate of 120 hours with Notify At set to 80%. She adds three tasks: "Site Survey", "Drawings" and "Client Meeting", and assigns them to her two designers. The next Monday, both designers can pick those tasks in My Timesheet.
Example 2. Daniel is setting up internal time tracking. He adds his own company as a client, then a project "Internal Work" with Apply To set to All Employees and Billable off. He imports 20 tasks, such as "Training" and "Team Meetings", from a spreadsheet, with All People on, so everyone can record internal time without being added one by one.
Who It's For
| Role | What They Can Do |
|---|---|
| Super Admin | Everything on the Client, Project, Task and Archived tabs. |
| Admin, or a custom role with Project Management ticked under Admin | Add, change, archive and delete clients, projects and tasks. Import tasks. |
| Project lead with a custom role | The same as above, if the role has Project Management. They don't see other people's timesheets unless the role also has Team Timesheet. |
| Manager or employee without Project Management | Can't open Project Management. They see only the projects and tasks they're on, in My Timesheet, My Task and My Project. |
Before You Start
- Your role has Project Management. It's one checkbox under Admin in the role's permissions. There's no view-only version. Read Timesheet And Project Management: Who Can Use What.
- Plan your structure. Write down your clients, the projects under each client and the tasks under each project. Decide which work is billable.
- Have business contact details ready for each client: a client code, a contact name, an email address, a contact number, a city and an address. Use business details only, not personal ones.
- Know each project's details: name, client, start date, end date (if it has one), the project manager, who will work on it, whether it's billable, and whether you want to track it against a cost or hours estimate.
- For a task import, have a spreadsheet with one row per task, and make sure each project name matches the project name in Plumm exactly.
- Set-up order for the whole Timesheet module: Project Management (this article), then timesheet policies, then people on each policy, then My Timesheet, then Team Timesheet approvals, then reports.
How It Works
The order is client, then project, then task, then time. A project must belong to a client, and a task must belong to a project. So add the client first, then the project, then the tasks.
Projects decide who can work on what. A project's Apply To setting chooses whether everyone (All Employees) or only named people (Select By Name) can record time on it.
Tasks decide what each person can pick. In My Timesheet, a person can only add a task if they're an Assignee on it, or All People is on for the task. All People "Applies to current and future eligible employees in this project", so people added to the project later get the task too.
Billable is set by the admin, not by the person recording time. Projects have a Billable switch and each task has its own Billable setting. Hours on a billable task count as billable hours in Timesheet reports. People can't change it when they record time.
Estimates are a guide. A project's estimate (in cost or hours) and its Notify At percentage give an early email warning when the project is getting close to its estimate. They don't stop anyone recording more time.
Archive keeps old projects out of the way. Archiving a project moves it to the Archived tab and takes it out of the current project list. You can unarchive it later. Clients can't be archived, only changed or deleted.
Deleting is permanent. Deleting a client, project or task can't be undone. Plumm asks you to confirm, and for some deletes you must type DELETE or add a delete comment.
How it connects to other parts of Plumm:
- My Timesheet: each task row shows the task, its project and its client, with Billable or Non Billable. Read My Timesheet.
- My Task and My Project: people see the tasks and projects they're on. Read My Project Time.
- Reports: billable and non-billable hours in Timesheet reports come from the task's Billable setting. Read Timesheet Summary Tab (Admin View).
- Payroll: for hourly paid people, approved timesheet hours linked to a project task can feed payroll. Read Overtime In Payroll.
Step-By-Step Instructions
Work through the three parts in order: clients, projects, then tasks.
Part 1: Clients
Clients: Open The Client List
- Click Admin, then Project Management.
- You see five tabs along the top: Client, Project, Task, Summary and Archived.
- Click Client. You see the client list, with the columns Name, Headcount, Country and Projects.
- Above the list you see a Search box, a download button and Add Client.
Clients: Add A Client
- On the Client tab, click Add Client. A panel opens on the right.
- In Client Name, type the company's name, for example "Harbour Design Ltd".
- In Client Code, type a short code, for example "HDL01".
- In Contact First Name and Contact Last Name, type your main contact's name.
- In Email Id, type their work email.
- In Contact Number, type their work phone number.
- In Headcount, type how many people work at the client, as a whole number.
- In City, type the city.
- Open Country and pick the country.
- In Address, type the business address.
- Click Confirm.
- You see Client added. The client appears in the list.
If Plumm doesn't save, one of the required boxes is empty. Check Client Code, the contact name, Email Id, Contact Number, City and Address.
Clients: View Or Change A Client
- On the Client tab, find the client. Type part of its name in Search if the list is long.
- Click the client's row, or open its three-dot menu and click View or Edit. A panel called Edit Client opens with the details filled in. There's no separate client page.
- Change any box you need.
- Click Confirm.
- You see Client updated. Open the client again to check your change saved.
Clients: Delete A Client
Deleting can't be undone, and clients can't be archived. Only delete a client you added by mistake or will never use.
- On the Client tab, open the client's three-dot menu and click Delete.
- A box says "Are you sure you want to delete this? This action cannot be undone."
- In Type DELETE here, type DELETE in capital letters.
- Confirm.
- You see Client deleted, and the client is removed from the list.
If you type anything else, Plumm says "Please type DELETE to confirm deletion" and doesn't delete. To stop, press Esc or close the box.
Clients: Search For A Client
- Type part of a client name in Search.
- The list shows matching clients. If nothing matches, it says Nothing to show here yet.
- Clear the box to see all clients again.
Clients: Sort The List
- Click a column name, such as Name or Headcount.
- The list sorts by that column. Click it again to reverse the order.
Clients: Move Between Pages
The list shows 10 clients per page. Use the page numbers at the bottom to move between pages.
Clients: Download The Client List
- Click the download button above the list.
- Plumm downloads the client list as an Excel file.
Part 2: Projects
Add projects after their clients exist.
Projects: Add A Project (Step 1, Details)
- Open the Admin area and select Project Management.
- Select the Project tab.
- Select Add Project. A panel slides open on the right. Wait for the boxes to load. This can take a few seconds.
- Name: type the project's name, for example "Office Refit".
- Client: open the dropdown and pick the client. If a client you just added isn't in the list, type part of its name in the dropdown's search.
- Start Date: pick the day the project starts.
- End Date: pick the day it ends, if it has an end. Use the date picker rather than typing the date.
- Apply To: choose who can record time on this project.
- All Employees: everyone in the company can pick this project.
- Select By Name: only the people you choose. A box appears where you pick each person.
- Manager: pick the person who manages the project.
- Billable: switch it on if the client pays for this work. Leave it off if they don't.
- Go to the next step, Estimate.
Projects: Add A Project (Step 2, Estimate)
- Type: choose whether you estimate the project in money (cost) or in hours.
- If you chose cost, type the Cost and pick the Currency.
- Notify At: type a percentage, for example 80. When the project reaches this share of its estimate, Plumm sends an email warning.
- Reset: choose Never if the estimate is for the whole project, or Monthly if the estimate starts again each month.
- Select Submit.
- A green message Project added appears.
Projects: Check That Your Project Saved
- On the Project tab, search for the project name.
- If it isn't in the list, select the Task tab, select Add Task, then Create Task, and open the Project dropdown. If your project is there, it saved. Don't add it again.
- Close the panel without saving if you were only checking.
Projects: View, Change Or Delete A Project
- On the Project tab, find the project. Use Search if the list is long.
- Open the row's menu.
- Choose what you want to do:
- View: see the project's details.
- Edit: the Add Project panel opens with the current details. Change what you need and select Submit.
- Delete: a confirmation box opens. Add a delete comment and confirm. The project is removed and can't be recovered.
Projects: Archive A Project
Archive a project when the work has finished but you want to keep a record of it.
- On the Project tab, open the row's menu for the project.
- Select Archive.
- Confirm in the box that opens.
- The project moves to the Archived tab and is no longer in the current project list.
Projects: View, Unarchive Or Delete An Archived Project
- Select the Archived tab. If nothing has been archived, the list is empty.
- Find the project. The list shows the same details as the Project tab, including Estimated Cost and Estimated Hours.
- To bring it back, open the three-dot menu at the end of the row, select Unarchive and confirm with Yes. The project returns to the Project tab.
- To remove it for good, open the three-dot menu, select Delete, enter a delete comment and select OK. This can't be undone.
Part 3: Tasks
Add tasks after their projects exist.
Tasks: Open The Task List
- Click Admin, then Project Management.
- Click the Task tab.
- You see the task list with the columns Task Name, Project, Billable, Assignee, Start Date, End Date and Created Date.
- Above the list are Search, the download button and Add Task.
Tasks: Add One Task
- On the Task tab, click Add Task. A small menu shows Create Task and Import Task.
- Click Create Task. A panel opens.
- In Task Name, type a clear name, for example "Site survey".
- Type a short description of the task if it needs explaining.
- Pick the Task Start Date and Task End Date from the calendars.
- Open Project and pick the project. You can pick only one.
- Open Assignee and pick the people who can record time on this task. You can pick several.
- Turn on All People instead if everyone on the project, now and in future, should get this task.
- Turn on Billable if the client pays for this work. Leave it off if not.
- If the same task belongs in other projects, pick them in Duplicate the Tasks to Other Projects. Leave it empty if not.
- Click Confirm.
- You see Task added. The task appears in the list.
If you click Confirm twice by mistake, Plumm still makes only one task.
Tasks: Change A Task
- On the Task tab, find the task. Use Search if the list is long.
- Click the task's row. A panel called Edit Task opens.
- Change what you need, for example the name, dates, assignees or Billable.
- Save your change.
- Refresh the page and open the task again to check the change stayed.
Tasks: Add Someone To A Task
- Open the task with Edit Task.
- Open Assignee and add the person.
- Save.
- Ask them to open My Timesheet and check they can add the task.
Tasks: Delete A Task
- On the Task tab, open the task's three-dot menu and click Delete.
- Confirm.
- Wait a few seconds. If the task still shows, refresh the page.
Before you delete a task, check whether people have already recorded time on it.
Tasks: Import Many Tasks At Once
- On the Task tab, click Add Task, then Import Task.
- Click Download Template. An Excel file downloads.
- Open the file. Fill in one row per task: the task name, description, start date, end date, project, billable and assignee. Use the exact project names from Plumm.
- Save the file.
- Back in Plumm, upload your file and pick the Date Format you used. Click Next.
- On Match The Column Titles, check each column in your file is matched to the right Plumm field. Click Next.
- If rows have errors, Plumm lists them. Fix them in your file and upload again, or click Skip on a row you don't want. Skipped rows aren't imported.
- Click Import.
- Go back to the Task tab and check the new tasks are there. Count them against your file.
Tasks: Search, Sort And Download Tasks
- Search: type part of a task or project name.
- Sort: click a column name, such as Task Name.
- Page size: choose 10 or 50 tasks per page at the bottom, and use the page numbers to move between pages.
- Download: click the download button. Plumm downloads the task list as an Excel file called Task.xlsx.
Finish: Check The Set-Up From An Employee's View
- Ask one person who is an assignee on a new task to open My Timesheet.
- They select Add Task and pick the project and task.
- If they can't find it, check the project's Apply To, the task's Assignee or All People setting, and that the project isn't archived.
Every Setting And Option Explained
Client: Fields On The Add Client Panel
| Field | What It Means | Required | When To Use It |
|---|---|---|---|
| Client Name | The name people see next to projects and tasks. | Yes | Always. Use the name your team knows. Keep it short. |
| Client Code | A short reference code. | Yes | Always. Use the same code as your finance system. |
| Contact First Name | Your main contact's first name. | Yes | Always. |
| Contact Last Name | Your main contact's last name. | Yes | Always. |
| Email Id | Your contact's work email. | Yes | Always. Work details only. |
| Contact Number | Your contact's work phone number. | Yes | Always. Work details only. |
| Headcount | How many people work at the client. | No | For your own reference. Type a whole number. |
| City | The city the client is in. | Yes | Always. |
| Country | The country the client is in. | — | Pick from the dropdown. |
| Address | The client's business address. | Yes | Always. |
Client: List Columns
| Column | What It Shows |
|---|---|
| Name | The client's name. |
| Headcount | The headcount you entered. |
| Country | The country you picked. |
| Projects | How many projects belong to the client. |
Client: Row Menu Options
| Option | What It Does |
|---|---|
| View | Opens the client's details. |
| Edit | Opens Edit Client to change details. |
| Delete | Deletes the client after you type DELETE. |
Client: Messages You Might See
| Message | What It Means |
|---|---|
| Client added | The new client is saved. |
| Client updated | Your changes are saved. |
| Client deleted | The client is removed. |
| Please type DELETE to confirm deletion | You didn't type DELETE exactly. |
| Nothing to show here yet | No clients match your search. |
Project: Fields On The Add Project Panel
| Setting | What It Does | When To Use It |
|---|---|---|
| Name | The project name people pick in My Timesheet. | Always. Use a name people will recognise. |
| Client | Which client the project belongs to. | Always. |
| Start Date / End Date | When the project runs. | Set the end date when the work has a fixed end. |
| Apply To: All Employees | Everyone can record time on it. | Company-wide work, such as internal meetings. |
| Apply To: Select By Name | Only chosen people can record time on it. | Client work done by a set team. |
| Manager | The project's manager. | Always. |
| Billable | Marks the work as paid for by the client. | On for client-paid work, off for internal work. |
| Type | Estimate in cost or in hours. | Pick the one your team tracks. |
| Cost / Currency | The money estimate and its currency. | When Type is cost. |
| Notify At | The percentage of the estimate that triggers an email warning. | To get an early warning before the estimate runs out. |
| Reset | Never or Monthly. With Monthly, the estimate starts again at the beginning of each month. | Monthly for retainers that start again each month. |
Project: List Columns
The Project tab lists projects with these columns: Name, Client, Billable, Manager, Type, Assign To, Start Date, End Date, Created Date, Estimated Cost and Estimated Hours. It also has a Search box and a download button.
Project: Row Menu Options
- View: opens the project's details.
- Edit: opens the project panel so you can change it.
- Archive: moves the project to the Archived tab, after you confirm.
- Delete: removes the project for good, after you add a delete comment and confirm.
Archived Tab Columns And Options
- Columns: Name, Client, Billable, Manager, Type, Assign To, Start Date, End Date, Estimated Cost and Estimated Hours.
- Three-dot menu: Unarchive (confirm with Yes) and Delete (enter a delete comment, then OK).
Task: Fields On The Create Task Panel
| Field | What It Does | Choices | When To Use It |
|---|---|---|---|
| Task Name | The name people pick in My Timesheet. | Free text | Always. Make it clear and specific. |
| Description | A note about the task. | Free text | When the name needs explaining. |
| Task Start Date | When the task starts. | A date | Always. |
| Task End Date | When the task ends. | A date | Always. |
| Project | The one project the task belongs to. | One project | Always. |
| Assignee | The people who can record time on the task. | Several people | When only some people work on it. |
| All People | Gives the task to everyone on the project, now and in future. | On or off | Tasks everyone on the project does, such as team meetings. |
| Billable | Marks the task's hours as billable. | On or off | On for work the client pays for. |
| Duplicate the Tasks to Other Projects | Copies the task into other projects. | Several projects | When the same task is used in several projects. |
Task: Assignee Or All People
| Choice | Who Gets The Task | Example |
|---|---|---|
| Assignee | Only the people you pick. | "Site survey" for two surveyors. |
| All People | Everyone on the project, including people added later. | "Team meeting" for the whole project. |
Task: Billable On Or Off
| Setting | How Hours Count | Example |
|---|---|---|
| On | Billable hours in reports. | Design work the client pays for. |
| Off | Non-billable hours in reports. | Internal meetings, training. |
Task: List Columns
| Column | What It Shows |
|---|---|
| Task Name | The task's name. |
| Project | The project it belongs to. |
| Billable | Yes or No. |
| Assignee | Small pictures of the people on the task. |
| Start Date, End Date | When the task runs. |
| Created Date | When the task was added. |
Task: Import Steps
| Step | What You Do |
|---|---|
| Download Template | Get the Excel file to fill in. |
| Upload and Date Format | Upload your file and say how dates are written. |
| Match The Column Titles | Match your columns to Plumm's fields. |
| Errors and Skip | Fix or skip rows with problems. |
| Import | Add the tasks. |
What Happens Next
- People on the project (by Apply To) and assignees on each task (or everyone, with All People) can add the task in My Timesheet and record time on it.
- The task shows in My Task and the project shows in My Project for each person on it.
- People see the client's name next to each task row when they record time.
- Hours recorded count as billable or non-billable in reports, based on the task.
- When a project reaches its Notify At percentage, Plumm sends an email warning.
- Next, create timesheet policies and add people to them. Read Admin – Add Timesheet Policy (Manage Timesheet Tab).
Limitations And Things To Know
- Clients can't be archived, only deleted.
- Deleting a client can't be undone.
- Keep client names short and clear. Very long names aren't accepted.
- The client form has no budget or billing settings. Those belong to the project.
- Use business contact details only.
- A project has no separate project code box. Put a code in the name if you need one.
- An estimate is a guide. It doesn't stop people recording more time.
- Billable marks time as billable in reports. It doesn't send an invoice.
- Billable is set on the task. People can't change it when they record time.
- A task belongs to one project. Use Duplicate the Tasks to Other Projects to reuse it.
- An import doesn't check for tasks you already have. Check the list before you import the same file again.
- Search matches task names and project names.
- Deleting a task can take a few seconds. Refresh if it still shows.
- Check whether time has been recorded on a task before you delete it.
Troubleshooting
- If you click Confirm and nothing saves, a required box is empty. Check Client Code, the contact name, Email Id, Contact Number, City and Address.
- If your client name isn't accepted, make it shorter.
- If your search finds nothing, try fewer letters, or leave out punctuation such as apostrophes.
- If you see "Please type DELETE to confirm deletion", type DELETE in capital letters.
- If a new client isn't in the project's Client dropdown, type its name in the dropdown to search for it.
- If the Add Project panel keeps loading, close it, refresh the page and try again. If it still doesn't load, contact Plumm support.
- If you added a project but don't see it on the Project tab, don't add it again. Check the Project dropdown in Task > Add Task > Create Task. If it's there, it saved. Tell Plumm support the list didn't update.
- If an employee can't see a project in My Timesheet, check they're included in Apply To (or it's set to All Employees), that the project has a task they're assigned to, and that the project isn't archived.
- If an employee can't find a task in My Timesheet, check they're an Assignee on it (or All People is on) and that they're a member of the project.
- If a new task doesn't appear in the list, refresh the page and search for it. If it's still missing, add it again and check you see Task added.
- If search shows tasks with a different name, search also matches project names.
- If a deleted task still shows, wait a few seconds and refresh.
- If an import row has an error, check the project name matches Plumm exactly and the dates match the Date Format you picked.
- If imported tasks appear twice, you imported the same rows twice. Delete the extra copies.
- If you can't see Project Management, ask your Super Admin to tick Project Management under Admin on your role.
FAQs
Why Do I Need To Add A Client First?
Every project belongs to a client, so the client must exist before you add its projects.
What Should I Use As The Client Code?
The same code your finance or billing system uses, so reports match.
Can I Archive A Client?
No. Clients can only be changed or deleted.
Can I Undo A Delete?
No. Add the client again if you deleted it by mistake.
Can I Assign A Project To Specific Employees?
Yes. In Apply To, choose Select By Name and pick the people.
What Is Notify At For?
It's a percentage of the project's estimate. When the project reaches it, Plumm sends an email warning, so you can act before the estimate runs out.
What Happens If I Choose Monthly For Reset?
The project's cost or hours estimate starts again at the beginning of each month. Use it for retainers.
Can I Unarchive A Project?
Yes. On the Archived tab, open the row's three-dot menu, select Unarchive and confirm with Yes.
Does Billable Mean The Client Gets An Invoice?
No. It only marks the hours as billable in reports.
What's The Difference Between A Project And A Task?
A project is a piece of work for a client. A task is a smaller job inside it. People record time against tasks.
Can Employees Change Whether Their Time Is Billable?
No. It comes from the task.
What Does All People Do?
It gives the task to everyone on the project, including people added later.
Can I Add The Same Task To Several Projects Quickly?
Yes. Create it once and pick the other projects in Duplicate the Tasks to Other Projects.
What Happens If I Import The Same File Twice?
The tasks are added again. Check the list before importing.
Who Can See A Task In My Timesheet?
Its assignees, or everyone on the project if All People is on.